853 MW Ic Anadolu Combined Cycle Power Plant, Turkey

853 MW Ic Anadolu Combined Cycle Power Plant

Construction of a Combined Cycle Power Plant (CCPP) in Kırıkkale, Turkey with a total power output of 853 MW is realized for İç Anadolu Doğalgaz Elektrik Üretim ve Ticaret A.Ş. is implemented on a turnkey basis.

GE STAG 209 9FB MS, is used in the power plant which is designed for 30 years lifespan. GAMA Power Systems and GE Energy as consortium undertakes the responsibility of supply and erection of 2 GE 9FB gas turbines, 1 GE steam turbines, 2 Doosan HRSG’s, Air Cooled Condenser, 380 kV HV switchyard as well as all balance of plant equipment under an EPC contract. Within this scope, basic & detail design of the power plant, civil works, structural, electro mechanical works, erection, installation of electrical, instrumentation & control systems, test and commissioning, start-up works and training of the Employer’s personnel performed in the course of project.

İç Anadolu Combined Cycle Power Plant generates about 6,300 GWh Energy which corresponds 2.5% of total national Energy consumption and almost 50% of Ankara’s energy consumption.
Location Icon
Location

Kirikkale, Turkey

Client Icon
Client

İç Anadolu Doğalgaz Elektrik Üretim ve Ticaret A.Ş. (GAMA ENERJİ)

Contractor Icon
Contractor

GAMA Power Systems Inc. and GE Energy Products France SNC Consortium

Duration Icon
Project Duration

36 Months (December 2013 - December 2016)