Supply and installation of Enerjisa Adana Combined Cycle Power Plant auxiliary steam boilers and turn key basis supply belongs to these systems.
Country: Turkey
HRSG Boiler and Exhaust by pass system supply, commissioning and training for Owner’s personnel.
Modernization of existing plant system turnkey basis.
Based on PPA, the project is a fully privately financed and constructed on turn-key basis with two significant phases:
- Construction of 150 MW (established capacity) combined cycle diesel power plant (consist of 13 each 11 MW engines and one 9.5 MW steam turbune & generator),
- Operation of the power plant for 5 years with 8,760 hr/year and 130 MW-100% availability.
EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client’s personnel.
Operation of the plant is also in the scope of GAMA.
One ea. HRSG (behind Frame 6 gas turbine), one ea. FM-120/97 and FM-103/88 natural gas and oil fired boiler design, supply and construction and existing HRSG modification.
Two sets of HRSG (behind Frame 6 gas turbine) design, supply and construction
Towerpack type Stirling, coal fired, boiler design, supply and construction.
Turnkey design, supply and construction of a natural gas fired cogeneration plant, comprising two GE frame 6B gas turbine generators (39.5 MW capacity each) and two HRSG’s (each generating 80 tons/hr of medium pressure and 4 tons/hr of low pressure steam), including all auxiliary components are executed.
Two sets of FM 120/97 (88 t/hr) natural gas and oil fired, boiler design, supply and construction.
1 ea. fuel oil and natural gas fired PFI 17-15 Babcock&Wilcox; steam boiler design, supply and construction.