DISI MUDAWARRA – AMMAN WATER CONVEYANCE PROJECT

DISI Mudawarra – Amman Water Conveyance Project

The project involves, in order to supply additional urban water to the Greater Amman Area, the raising of water from Rum Aquifer, in the Disi Mudawarra area in the south of Jordan, from 55 deep water wells to be drilled and the conveyance of the water to the Greater Amman Area, a distance of 346 km. The conveyance system is designed to supply 100 milyon m3 per year of water for a period of 50 years service life of the project plant operation.

EPC project includes all basic & detail design, procurement of all equipment, all civil, structural, electromechanical works erection, installation of all electrical, instrumentation & control systems as well as testing, commissioning and start-up works and Employer’s personnel training.

420 MW Riga Combined Cycle Power Plant

EPC Contract for 420 MW Riga Electrical and 270 MW Thermal Output Power Plant is implemented on a turnkey basis.

Combined cycle power plant in one multi-shaft arrangement. Power plant is comprised of one GE 9FB.03 gas turbine, one GE 330H generator, Siemens ST ENK, HNG, WK steam turbines and generators with associated heat recovery steam generators.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

Surgut 800 MW Combined Cycle Power Plant

EPC Contract for Surgut 800 MW Combined Cycle Power Plant is implemented on a turnkey basis.

GE International Inc.(GEII) – GAMA Power Systems Consortium constructed two 109FA 50Hz Single-Shaft configured Power Plant, comprised of one GE 9FA gas turbine, one GE D10 steam turbine, one GE 390H generator, a horizontal three-pressure level CMI Heat Recovery Steam Generator, plus balance of plant equipment necessary for the plant’s operation.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

220 MW Skopje Combined Cycle Power Plant

EPC Contract for 220 MW Skopje Combined Cycle Cogeneration Power Plant is implemented on a turnkey basis.

GAMA Power Systems – Alstom Consortium constructed a combined cycle cogeneration power plant which is comprised of one Alstom 13E2 gas turbine unit (GT), one; two pressure heat recovery steam generator (HRSG) and one Alstom 8CK76 steam turbine (ST) on EPC basis. The power block is a combined cycle power block in multi-shaft arrangement and with a net power output of 227 MWe and a heat extraction of 160 MWt for the supply of district heating water, plus balance of plant equipment necessary for the plant’s operation.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

400 MW Shatura Combined Cycle Power Plant

EPC Contract for 400 MW Shatura Combined Cycle Power Plant is implemented on a turnkey basis.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

450 MW Whitegate Combined Cycle Power Plant

EPC Contract for 450 MW Whitegate Combined Cycle Power Plant is implemented on a turnkey basis

GE Corporation – GE International Inc. – GAMA Power Systems Consortium’s scope of supply for this project is to construct one 109FB 50Hz Single-Shaft configured power plant, comprised of one GE 9FB gas turbine, one GE A15 steam turbine, one GE 450H generator, heat recovery steam generator, plus balance of plant equipment necessary for the plant’s operation.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

Isdemir – 6 & 7 Steam Boiler Project

Engineering, procurement, fabrication and installation of two steam boilers with a capacity of 250 ton/hr at the İskenderun Iron and Steel Works Company.

TUPRAS 10F/105A Steam Boiler Retubing Works

Re-tubing and repair of pressure and non pressure parts of 10F-105A Steam Boiler in Tupras Refinery in Izmit. This boiler was originally built in 1997 by GAMA and had suffered an extensive damage due to an accident on February 2006.

300 MW Samra Combined Cycle Power Plant

Project is a natural gas/fuel oil fired combine cycle plant providing a nominal 300 MW electrical output. The power island consists of two GE combustion turbine generators, which feed exhaust gases to two Nooter Eriksen HRSGs, which in turn feed steam to a single Fuji steam turbine generator set. The plant fires natural gas fuel and fuel oil. Power is generated at 15 kV in the CTGs and 15 kV in the STG, and then stepped up through individual transformers to the Jordan grid voltage at 400 kV. Plant auxiliary power is back-fed from the grid or GSUs through an auxiliary transformer on each CTG bus.

EPC Contract’s scope covers procurement of all major equipment as well as other auxiliary equipment, and conceptual and detail engineering of the plant, civil and electro-mechanical installation works, test and commissioning works and training of the Employer’s staff.

400 MW Tynagh Combined Cycle Power Plant

Tynagh Energy Limited has built Galway’s first power generation facility. The circa €300 million power plant is a modern state-of-the art facility using the latest in advanced engineering technology. It uses the cleanest available fuel, natural gas, which significantly reduces emissions of carbon dioxide. For the first time, Galway city and the region has a reliable and efficient source of power.

Approximately 30 years life-span power plant was built under a turnkey contract with a consortium of General Electric Company / General Electric International Inc. and GAMA Power Systems Inc. The gas turbine used is a GE 9FA design. F-class gas turbines were developed in the late 1980s and are considered commercially proven with a track record of high availability and reliability. The steam turbine is a GE A15 ‘HEAT’ (high efficiency advanced technology) model, with a GE 9A5 electrical generator. The designs of both the A15 steam turbine and the 9A5 electrical generator were developments from previous GE models that are fully proven technology. These are logical evolutions from previous models and incorporate GE’s comprehensive design process and field-testing facilities which are without doubt world-class.