ENTEK IZMIT COGENERATION PLANT HRSG

Entek Izmit Cogeneration Plant HRSG

Turnkey EPC project for installation of two pressure HRSG behind GE LM6000 PC Sprint type Gas Turbine and by-pass stack at İzmit Electric Power Generation Plant.

Pressure and output of HRSG; HP: 55 bara/14,5 ton/hr.

2×8 MW Cumra Sugar Factory Power Plant

GAMA Power Systems implemented turnkey design, supply and construction of a coal fired power plant, comprising 2 sets Babcock & Wilcox licensed 75 ton/hr (38 bar (a), 425°C) steam supply. Circulated Fluidized Bed (CFB) boiler, 2 sets Siemens steam turbine generators and one ea. 38 bar (a), 425°C steam supply, 60 ton/hr. capacity package type boiler, coal and limestone storage buildings including all auxiliary components.

38 MW Ayen Ostim Combined Cycle Power Plant

GAMA Power Systems performed turnkey design, supply and construction of a natural gas fired combined cycle power plant, comprising GE (USA) LM2500 PY+DLE double shaft aeroderative gas turbine, Thermodyn (France) steam turbine and Aalborg Engineering (Denmark) HRSG (generating 30 tons/hr of high pressure and 7 tons/hr of low pressure steam), including all auxiliary components.

150 MW Kirikkale Diesel Power Plant

Based on PPA, the project is a fully privately financed and constructed on turn-key basis with two significant phases:

  1. Construction of 150 MW (established capacity) combined cycle diesel power plant (consist of 13 each 11 MW engines and one 9.5 MW steam turbune & generator),
  2. Operation of the power plant for 5 years with 8,760 hr/year and 130 MW-100% availability.

EPC contract includes all basic & detailed design of the power plant, procurement of all power plant equipment, all civil, structural works, all mechanical erection works, installation of all electrical, instrumentation and control systems. The contract also includes commissioning, start-up works and training of client’s personnel.

Operation of the plant is also in the scope of GAMA.