One ea. HRSG (behind Frame 6 gas turbine), one ea. FM-120/97 and FM-103/88 natural gas and oil fired boiler design, supply and construction and existing HRSG modification.
Grouping: GAMA Power
1 ea. fuel oil fired FM20-70 Babcock&Wilcox; steam boiler design, supply and construction.
Two sets of HRSG (behind Frame 6 gas turbine) design, supply and construction
Four ea. FM 120/97 type, natural gas and oil fired, boiler design, supply and construction.
Towerpack type Stirling, coal fired, boiler design, supply and construction.
Turnkey design, supply and construction of a natural gas fired cogeneration plant, comprising two GE frame 6B gas turbine generators (39.5 MW capacity each) and two HRSG’s (each generating 80 tons/hr of medium pressure and 4 tons/hr of low pressure steam), including all auxiliary components are executed.
Two sets of FM 120/97 (88 t/hr) natural gas and oil fired, boiler design, supply and construction.
1 ea. fuel gas fired FM117-88 Babcock&Wilcox; steam boiler design, supply and construction.
1 ea. fuel oil and natural gas fired PFI 17-15 Babcock&Wilcox; steam boiler design, supply and construction.
One set of FM 103/79 type,natural gas and fuel oil fired, 20 t/hr. package boiler design, supply and construction