SASA Steam Boiler Project Two sets of FM 120/97 (88 t/hr) natural gas and oil fired, boiler design, supply and construction. Location Adana, Turkey Client SASA Polyester Sanayi A.Åž. Project Duration 13 Months (November 1995 - December 1996)